A full kitchen refresh required new supply lines and an updated waste connection.
We prepared the existing services, capped legacy lines, and verified the isolation points.
New connections were installed to match the appliance layout and cabinetry clearances.
Flow and drainage were tested through multiple cycles to confirm smooth performance.
We pressure-checked the system, ensuring no leaks at joints or fittings.
The client received a clear map of shutoff points for future maintenance.
Final inspection confirmed clean access, compliant spacing, and reliable operation.
